1989-10-11 16:46 SECURITY BRANCH

1. ROUGH INDICATION OF COSTS

Notes

(A) Supply & erection of Prefab Buildings

41 No. 3-storey at $1.7m

3 No. ! storev

20.5%

(B) Builders work in concrete foundations,

drainage, washing areas, toilers, storage tanks, plumbing, transformet Loom, etc.

85.2 5 BAA 507J P.05

Stage 1 Stare

t

это

Totui గా

32.80

37.90

70.70

water

30.00

13.30

43.30

(C) Electrical installations, perimeter

lighting, fire fight ing syster, water pumping systems, LPG storage, etc.

23.00

11.80

34.80

(D) Geotechnical works

7.00

8.00

15.00

(E) Security perimeter tences (5.2m high)

3.50

4.50

8.00

(F) Water Supply

55.00

55.00

WSD submarine pipeline ($55m)

desalination plant

($2/w)

-

barged supply

60.00

60.00

($50m)X ($12m)

(G) Sewage Treatment

SPD full systém

- Floating Barge(s)

(H) CL & P elect. mains supply

(1) Berthing Pier (Port Work.)

(J)

Contingency

10.00

10.00

12.00

8.00

20.00

$233.30m

383.50m 3316.80m

say

$320

Av. cost per head

$16,000

1. Whitehead costs for Stages I & II

-

$140.6m for 8,000 population

2. Pillar Point

- $79m for 5,000 population

ADAABA

-

$17,575 per head.

$15,800 per head.

/P. 3

Share This Page