1989-10-11 16:46 SECURITY BRANCH
1. ROUGH INDICATION OF COSTS
Notes
(A) Supply & erection of Prefab Buildings
41 No. 3-storey at $1.7m
3 No. ! storev
20.5%
(B) Builders work in concrete foundations,
drainage, washing areas, toilers, storage tanks, plumbing, transformet Loom, etc.
85.2 5 BAA 507J P.05
Stage 1 Stare
t
это
Totui గా
32.80
37.90
70.70
water
30.00
13.30
43.30
(C) Electrical installations, perimeter
lighting, fire fight ing syster, water pumping systems, LPG storage, etc.
23.00
11.80
34.80
(D) Geotechnical works
7.00
8.00
15.00
(E) Security perimeter tences (5.2m high)
3.50
4.50
8.00
(F) Water Supply
55.00
55.00
WSD submarine pipeline ($55m)
desalination plant
($2/w)
-
barged supply
60.00
60.00
($50m)X ($12m)
(G) Sewage Treatment
SPD full systém
- Floating Barge(s)
(H) CL & P elect. mains supply
(1) Berthing Pier (Port Work.)
(J)
Contingency
10.00
10.00
12.00
8.00
20.00
$233.30m
383.50m 3316.80m
say
$320
Av. cost per head
$16,000
1. Whitehead costs for Stages I & II
-
$140.6m for 8,000 population
2. Pillar Point
- $79m for 5,000 population
ADAABA
-
$17,575 per head.
$15,800 per head.
•
/P. 3