4. COMPARISON TABLE

Romney Huts

Vs Prefabricated Buildings

:

Construction

I

Fire hazard

Description

(single

storevE

1

Buildings

[

3 storevs)

Corrugated metal

I sheets on metal i structural

frame,

Susceptible to fire damage Exposed metal I frames

4 months.

Cement board

| panels on metal

i structural frame.

| Less

suscepliable. ¡ All structural

metals are

Protected.

5 months.

!

Erection time for buildings (excluding infra-structure &

geotechnical works)

Construction time for infra-structure &

! geotechnical works

16 months.

| Wider spread-out

of buildings.

1 50%

!

4 months.

More concentrated

¦ layout.

I

80%

Demountability

! Heat Insulation

Wall

| None

Ceiling

| None

¡ Quality Control

¦

Appearance

i

| Cost for Building Supply

!

| Good

! Interior

1

| $24.00m

| Good Good

| Good

Superior

{ $70.70m

$15.00m

| Cost for Geotechnical Works,

site formation

Comp Management

· $60.00m

1

ADAABA

bi:i

wide-spread

building layout.

!

Raster Management,

12. 5

Share This Page