3. DESIGN CONCEPT

3

AKB SUN4

(A) Minimise geotechnical and site formation works to reduce construction

period and captial cost.

use existing flattish area for Stage I accommodation for 10.000

VBP s

use existing helipad site for Stage Il accommodation for additional 10,000 VBP $

use best of existing buildings capable of conversion to new needs, e.g. LPG or DG stores, generator/diesel stores, switch rooms,

etc.

all in preference to dotting buildings over hillsides with extensive slope cutting, retaining walls, increased underground plumbing, electrical, drainage services, fencing and increased security and management problems.

(B) Maximise the use of 3-storey buildings to afford space in camp areas

for group activities,

(C) Maximise facilities in view of remoteness of island to give

reasonable measure of self-dependence.

Kitchen and food storage

-

Medical services

www

Segregation units

Workshop and services (VAS)

Staff accommodation/mess/recreational

facilities

(D) Permanent and reliable building services to avoid health and safety

hazards

fresh, created water supply by WSD

Sewage treatment system recommended by CPD

mains electrical supply by CL & P

fire fighting system requirements of FSD

new pier by CE/PW to provide berthing depth of 3m

(E) Crowd control, management

5.2m high fenced compounds to facilitate crowd control, security and camp management