3. DESIGN CONCEPT
3
AKB SUN4
(A) Minimise geotechnical and site formation works to reduce construction
period and captial cost.
use existing flattish area for Stage I accommodation for 10.000
VBP s
use existing helipad site for Stage Il accommodation for additional 10,000 VBP $
use best of existing buildings capable of conversion to new needs, e.g. LPG or DG stores, generator/diesel stores, switch rooms,
etc.
all in preference to dotting buildings over hillsides with extensive slope cutting, retaining walls, increased underground plumbing, electrical, drainage services, fencing and increased security and management problems.
(B) Maximise the use of 3-storey buildings to afford space in camp areas
for group activities,
(C) Maximise facilities in view of remoteness of island to give
reasonable measure of self-dependence.
Kitchen and food storage
-
Medical services
www
Segregation units
Workshop and services (VAS)
Staff accommodation/mess/recreational
facilities
(D) Permanent and reliable building services to avoid health and safety
hazards
fresh, created water supply by WSD
Sewage treatment system recommended by CPD
mains electrical supply by CL & P
fire fighting system requirements of FSD
new pier by CE/PW to provide berthing depth of 3m
(E) Crowd control, management
5.2m high fenced compounds to facilitate crowd control, security and camp management