1989-10-11 16:46 SECURITY BRANCH

1. ROUGH INDICATION OF COSTS

(A) Supply & erection of Prefab Buildings

At No. 3-storey at

No. ! storev 9.

(B) Builders work in concrete foundations,

drainage, washing areas,

water

storage tanks, plumbing, transtornet toom, etc.

9.3 5 8A8 5074

P.05

Stave

Stare 1

Totul

ST

32.80

37.90

70.70

30.00

13.30

43.30

(C) Electrical installations, perimeter

lighting, fire fight ing system, water pumping systems, LPG storage, etc.

23.00

11.80

34.80

(D) Geotechnical works

7.00

8.00

15.00

(E) Security perimeter tences (5.2m high )

3.50

4.50

8.00

(F) Waler Supply

55.00

55.00

WSD submarine pipeline (855-

+

desalination plant

harged supply

60.00

($50m x

($12)

(G) Sewage Treatment

SPP full system

Floating Barge's!

(H) CL & P elect. mains supply

(I) Berthing Pier (Port Works)

(J) Contingency

1

60.00

10.00

10.00

12.00

8.00

20.00

$203.30m 383.50m

3316.80m

Sav $320m

Av. cost per head - $16,000

1. Whitehead costs for Stages I & II- $140.6m for 8,000 population = $17,575 per head.

2. Pillar Point

ADAARA

$79m for 5,000 population

C

$15,800 per head.

/P. 3

་་