As an interim measure, Man Kam To Road is being
widened to provide one southbound lane and two northbound
lanes to allow traffic queuing to be confined to one lane,
leaving the remaining lane for other traffic. The widening
work will be completed at the end of this month. In
addition, a temporary vehicle holding area for 500 vehicles
has been completed in Sheung Shui. Another holding area for
100 vehicles will soon be available to Hong Kong bound
vehicles.
の
7.
の
The third crossing point at Lok. Ma Chau is being
constructed jointly with the Chinese. Stage one comprising a
two dual two-lane bridge, a border control complex and @ vehicle
holding areas is due for completion in April next year.
Stage two involving a second bridge will be completed in
early 1990. The total planned capacity is 40,000 vehicles a
day.
بھر
There are also plans to upgrade Sha Tau Kok Road.
Construction is expected to start next year. Based on
present projections, these improvements and new works will be
adequate to meet demand until the end of the century.
ole Sea Links
の
بھر
Sea and river transport has also been growing. A
релесизл
total of about 47,000 river vessels entered into the port of
Hong Kong with a throughput of 9.4 million tonnes in 1987,
representing an average increase of about 150 per annum over
the last five years.