3
The
Kung to Kowloon via Hiram's Highway and Clearwater Bay Road.
The completion of Route 5 from Sha Tin to Tsuen Wan and the
widening of Tai Po Road by the end of 1989 will relieve
substantially traffic congestion in the corridor.
completion of Road T6 across the Shing Mun River in 1990 will
provide a shorter route from Tolo Highway to Kowloon via the
Ma On Shan - Nai Chung link road.
5.
Sir, with these improvements, I hope that traffic
congestion at the Lion Rock Tunnel can be maintained at a
tolerable level until the opening of Tate's Cairn Tunnel in
1991.
WP
WDO 93 ZZ