reduce flooding and is already included in
the Public Works Programme under Item 22 CD.
Hence, the net additional capital cost of the
$26 million.
project is $26M Running costs for a period
$9 million.
of 10 years are estimated to be $9M.
(ii)
lc.
Item 29 DS (Category A) : Improvement to Yuen
Total cost
Long Sewage Treatment Works. $125 million.
$125M This project will upgrade the
standard of treatment from primary to
secondary and ensure that a high standard of
effluent is discharged into the nullah.
•
Work
is already in progress on this scheme which
is expected to be completed in 1989.
#milion
: $180) and 63 DS
(iii) Items 61 DS (Category B: $1800)
n
& million
(Category B: $98) : These projects will
provide a sewerage system, pumping stations,
rising mains and disposal facilities to serve
the areas around Tin Shui Wai and Kam Tin.
The combined sewage load from these areas
will be pumped into an effluent tunnel which
will discharge into a a long sea outfall
constructed out into Urmston Road. Pro
Provision
has been made in the scheme for a sewage
treatment works should that prove necessary
in future. Detailed design work on this
project is about to start. An alternative
would be to install sewage treatment
شایر