- 4-

Airport Public Car Park

15.

A total of 278 282 vehicles used the Multi-Storey Car Park, generating a revenue of $2.39 million.

Office Accommodation

16.

The occupancy of rentable accommodation in CAD buildings as at 30 September was as follows :-

Total Area Occupied

Vacant

Area

Name of Building

(m2)

%

(m2)

%

Terminal Office Block

9 735.65

100.00

Nil

Ni 1

Apron Services Complex

6 838.10

95.72

306.10

4.28

Air Cargo Terminal

Office Building

7 121.86

99.14

61.88

0.86

Airport Services Building

676.07

86.24

107.83

13.76

Runway, Taxiway & Aprons

17.

Resurfacing of Taxiway Bl, Taxiway Cl, all stub taxiways and the South Taxiway Bridge was completed, concluding this part of the Major Runway and Taxiway Works Project. To facilitate the project works, the following taxiway closures took place:

18.

Taxiway

A2

A3

A5

A6

A7

All

C1, C2

Date Closed

24 July

24 July

1 August

22 April

31 March

September 1986 16 June

Date re-opened

1 August

5 August early October 22 July 22 July

24 August 13 July

Construction of the Runway Hard Shoulders began on 3 August and some 60% of the western side and 15% of the eastern side of the runway has been paved. Landscaping work beyond the 7.5 m. paved shoulder on the western side commenced on 7 September.

19.

To facilitate drainage channel construction, a section of Taxiway D2 abeam Bays 15 and 21 was closed and re-routed via a diversionary taxiway northwest of the works site. In addition Bays 9, 15 and 21 were closed to aircraft parking.

20.

The survey of the Airport Fire Hydrant system by Water Supplies Department was largely completed. A full report of the findings is expected shortly.

21.

A programme of comprehensive refurbishment of taxiway signs, including new facings, was completed.