The off-site contingency plan is the
responsibility of local
authorities,
though GNPJVC will cooperate in its development. Typically, this plan. would be based on :
(1)
typically
to
a
radius 10km, where monitoring,
A zone in the immediate vicinity of the plant, of 5km and in any case not exceeding evacuation plans and other countermeasures are available.
(2) A wider
monitoring
are provided with
the
facilities zone where possibility of some countermeasures (not including evacuation) such as checks on food and water supplies.
1
:
1
1.