The off-site contingency plan is the

responsibility of local

authorities,

though GNPJVC will cooperate in its development. Typically, this plan. would be based on :

(1)

typically

to

a

radius 10km, where monitoring,

A zone in the immediate vicinity of the plant, of 5km and in any case not exceeding evacuation plans and other countermeasures are available.

(2) A wider

monitoring

are provided with

the

facilities zone where possibility of some countermeasures (not including evacuation) such as checks on food and water supplies.

1

:

1

1.

Share This Page