CONFIDENTIAL
FM HONG KONG
CONFIDENTIAL
i
(AMENDED DISTRIBUTION 21/10)
TO IMMEDIATE FCO
TELNO 3977
OF 21014OZ OCTOBER 87
INFO IMMEDIATE PEKING
119
OUR TELNO 3909 : DAYA BAY NUCLEAR POWER STATION
TOP
041644
MDHIAN 2063
OP COPY
HKC 146/3
RECEIVED IN REC. STVA
2 1 OCT 1987
DESK OFACER
INDEX
PA
THE SECRETARY FOR ECONOMIC SERVIES (SES) YESTERDAY (19 OCTOBER)
MET WITH THE LEGCO AD HOC GROUP ON THE DAYA BAY POWER PLANT, AT THEIR REQUEST, TO DISCUSS THE FOUR POINTS CONTAINED IN THEIR LETTER REPORTED IN OUR TUR.
2. THIS MEETING WAS ATTENED BY A TOTAL OF 15 LEGCO MEMBERS
INCLUDING
LEGCO AD HOC GROUP MEMBERS
(A) MR. WONG PO-YAN (CONVENOR)
(B) MR. CHUNG PUI-LAM (VICE-CONVENOR)
(C) MR. JACKIE CHAN
(D) DR. CONRAD LAM
(E) MR. CHENG HON-KWAN
(F) MR DESMOND LEE
.
(G) PROFESSOR POON CHUNG-KWONG
(H) MR. POON CHI-FAI
(I) MR. NGAI SHUI-KIT
NON-AD HOC GROUP MEMBERS
(J) MR.
MARTIN LEE
EDWARD HO
(J) MR.
(L) MR.
PANG CHUN-HOI
(M) MR.
(N) MR.
TAM YIU-CHUNG
SZETO WAH
(0) MR. ANDREW WONG
3. SES OUTLINED THE SEQUENCE OF EVENTS THAT FOLLOWED THE DISCOVERY
THAT THE FIRST LAYER OF THE REACTOR FOUNDATION WAS AT VARIANCE
WITH THE ORIGINAL DESIGN. THE FOUR SPECIFIC POINTS RAISED IN THE
LETTER SES RECEIVED FROM THE LEGCO AD HOC GROUP (TO
YET TO FORMALLY REPLY) WERE THEN CONSIDERED. DURING
DISCUSSION, THE FOLLOWING POINTS WERE MADE :
WHICH WE HAVE
THE ENSUING
PAGE
1
CONFIDENTIAL
124