PARLIAMENTARY QUESTION

For WRITTEN ANSWER on

01/12/87

Head of HKD147)

Please submit :-

a draft Answer

& Background

to Parliamentary Unit

before

Serial no:968

TEXT OF QUESTION :

30/11/87

NOON

Party

La

COHEN, HARRY (LEYTON)

To ask the Secretary of State/HMG: pursuant to his Ans of 26 Oct, what remedial action will be taken to ensure the safety of the Daya Bay power plant; who has been identified as responsible for the omission of the reinforcement bars from the first concrete layer; what representation he has received from the Govt of China on the implications of these faults for the safety of local residents.

to P/S

LORD GLENARTHUR

(Minister)

for answer by MR. EGGAR

(Minister)

for approval by

ANSWER

MKC 166 B

RECEIVED IN REGISTRY/

17 DEC 1987

PA

REGISTRY

Action Taken

DESK OFFICER

INDEX

NOON / Jeanser

...PQS... REPLY(S)

Additional bars and concrete reinforcement have been placed

in the second layer of the reactor raft in order to ensure that the safety requirements of the original design are met.

Since

Improvements have been made to the quality control

arrangements to avoid similar problems in the future. The

omission of bars was due to a wrong interpretation of technical drawings by the contractor and the inadequate enforcement of quality control checks:have not received any representations from the Government of China on the implications of these faults for the safety of local residents.

Le

copy to

Private Secretary

PS/ .MR..EGGAR.

(Minister)

Parliamentary

Clerk

an incorrect

as amended

f

authorised

Colt....

(Head of Dept)