18.12.86

9

-

PMS

9.50 am

MR MOTTRAM:

It is difficult. I don't believe that

the preliminary report indicated so. The site for some considerable time, and it is a pity I didn't bring photographs with me, but the

At the same time site for some considerable time was extremely dry.

I think Mr Lei has already made the point in the Auditor's Report, there was other construction works going on in the vicinity. I might

mention there was a hotel going up right across the road from Queen Elizabeth Stadium. And the photographs of the site at that time will indicate that that building was also under construction at the time. It is quite possible, as Mr Lei says, that the water table could have been affected by development going on in the area and the water table consequently being kept down to a reduced level.

13

14

15

CHAIRMAN:

Any more questions?

18

19

20

21

16

17

MR CHEONG:

Yes, I have one. I just want to ask one

question and that is, it was alleged by the construction company that

the project in doing that particular project, the Engineer

specifically instructed them to cast the concrete in the basement slab and walls in a particular manner and sequence. Now who is the engineer, is this the engineer of the consultant?

1

22

23

MR MOTTRAM:

Can I refer you back again to Appendix 3 ?

24

2

25

MR CHEONG:

Yes, right.

2

26

27

MR MOTTRAM:

28

29

30

31

32

33

34

Again the bottom paragraph, page 1.

"In the letters which you enclosed with your request

the contractor has stated that he had been instructed

to construct the sub-structure in a particular manner.

Our records show that no instructions of this nature

were ever issued. We are unable to find any confirmation

of verbal instructions to the same effect."

This letter was written shortly after that period.

[Reads]:

2

2

35

36

MR CHEONG:

Okay.