Date:

Time:

26.11.86

8.30 - 12.15 p.m.

151

Reporter:

MEP

1

D of Ar. S :

The point of?

2

3

MR CHEONG:

The point of detailed design?

4

5

D of Ar. S :

Certainly.

6

7

8

here.

9

10

11

CHAIRMAN:

Could I

I have a number of points

On paragraph 146 start off. It is claim submitted by super- structure roof air conditioning and electrical contractors which were settled at $18 million. Is that done by one main contractor

or a number of contractors?

12

13

D of Ar. S:

A number of contractors.

14

15

CHAIRMAN:

How much does the super-structure contractor

16

get out of the $18 million?

17

18

D of Ar. S:

For the building contract

this is

19

the super-structural contract it is $8.6 million.

20

21

CHAIRMAN:

He got additional -- claim

$8.6 million.

22

23

D of Ar. S:

Claim, yes.

24

25

CHAIRMAN:

Could you give us a breakdown of the

26

$18 million. I mean here is a super-structure get $8.6 million

27

28

D of Ar. S:

Roof contractor

--

the one who built the

29

roof, roof structure, is $3 million.

30

31

CHAIRMAN:

How much?

32

33

D of Ar. S:

34

35

$3 million. Electrical contract

$2 million. Air-conditioning contract $4.5 million and Fire Services

contract $0.3. A total of $18.4 million to be exact.

36