Date:
Time:
26.11.86
8.30 - 12.15 p.m.
151
Reporter:
MEP
1
D of Ar. S :
The point of?
2
3
MR CHEONG:
The point of detailed design?
4
5
D of Ar. S :
Certainly.
6
7
8
here.
9
10
11
CHAIRMAN:
Could I
I have a number of points
On paragraph 146 start off. It is claim submitted by super- structure roof air conditioning and electrical contractors which were settled at $18 million. Is that done by one main contractor
or a number of contractors?
12
13
D of Ar. S:
A number of contractors.
14
15
CHAIRMAN:
How much does the super-structure contractor
16
get out of the $18 million?
17
18
D of Ar. S:
For the building contract
this is
19
the super-structural contract it is $8.6 million.
20
21
CHAIRMAN:
He got additional -- claim
$8.6 million.
22
23
D of Ar. S:
Claim, yes.
24
25
CHAIRMAN:
Could you give us a breakdown of the
26
$18 million. I mean here is a super-structure get $8.6 million
27
28
D of Ar. S:
Roof contractor
--
the one who built the
29
roof, roof structure, is $3 million.
30
31
CHAIRMAN:
How much?
32
33
D of Ar. S:
34
35
$3 million. Electrical contract
$2 million. Air-conditioning contract $4.5 million and Fire Services
contract $0.3. A total of $18.4 million to be exact.
36