- 54

5.3.3 At present, the developed water frontage is about 2km. There are 10 deep water berths, of which one is capable

5.3.4

of handling vessels of

of up to 20,000 tonnes, one for vessels of up to 15,000 tonnes, and 4 for oil

for oil supply

workboats and tankers. The berths for the oil supply

boats are located in the eastern part of the bay where

water is about -7ni in depth. Other supporting

facilities include one 40 tonnes gantry crane, three 10

toures gantry crane, one spiral discharger for bulk cement, one clamping bag ship loader and other bagging machinery. The total throughput in the first 6 months

of this year was 1.5m tonnes which is equivalent to the

total throughput in 1986.

Reclamation work for another 2 new deep water berths

capable of handling vessels of up to 35,000 tonnes is in progress. One is expected to be completed by the end of

this year and the other, early next year. Though the

target date for completior of the whole port has not yet been fixed, the port has adopted a policy of 'using

while constructing'. Expansion work

has been

progressing continuously. The rate of further expansion

will depend on the traffic demand.

5.4 Others

Apart from the above visits, the Hong Kong delegation was also

visited the following places:

Tianhe Sports Centre

5.4.1 Mr. Shi Anhai, Vice-Mayor of Guangzhou City gave a brief

introduction of the Tiarhe Sports Centre. This was

an

followed by a tour of the major facilities.

the north-east suburb of Guangzhou on

airport site, the Sports Centre has an

Located at

ex-military

area

of 54 ha.

Page 75Page 76