5.1.7 Last year,

the total cargo throughput of Huangpu port

14.97m tonnes. It is expected that it would reach.

20m tonnes this year and 40m tonnes by the year 2000. The growth rate of 6% p.a. is likely to continue in the next few years. However, cautions should be taken when comparing the throughput figures of Huangpu port with

other ports because heavy loads such

as coals and iron

ores from northern provinces accounted for a large share

of the total throughput. Under the current policy of

"ore city one port", there are proposals to put

to put the

management of Guangzhou port and Huangpu port under one

authority.

new

road

5.1.8 It was noticed that the road connecting Guangzhou and

Huangpu was very congested. It was also learnt that a

was being constructed and would be open to

traffic before the end of 87. The availability of this

alternative route should help to improve the traffic

conditions and thus, the flow of goods between Guangzhou

and the port.

5.1.9

The Xin Sha Port is proposed to be built to the south of

the new port. The total length of water frontage is

7.5km and JC deep water berths would be built. The

first stage of the development comprising the

construction of 5 berths is to he finances by the World

Bard: and would be carried out later this year.

Invitation for tender for the port work construction had

been published in newspapers in July. Other land based

construction work would be carried out later. Together

with the construction of 5 berths, a road network of

about 1 km in length, linking the port with an existing

roadway leading to the Guangzhou-Shenzhen super-highway,

would he built. The work would also involve 2 highway

bridges crossing Dongjiang and а branch river.

Estimated to cost 200m RMP Yuan, the whole project is

expected to be completed by the

of the "Eighth

Five-Year Plan".