Annex G

prt on Shiu Fai Terrace Access Road Construction Survey

Questionnaires distributed

Questionnaires returned

% of Receipt

1250

300

24%

No. of Questionnaires

%

Access Through Way to Kennedy Road

243

81%

Access Through Way to Shiu Fai Terrace

36

12%

Cbjection to any construction

No Comment

14

4.7%

7

2.3%

Summary of Opinions

2.

༣.

Traffic in Shiu Fai Terrace is already congested before and after office hours.

Large number of school-buses, private cars etc., are parked along the road before and after school which aggravates the congestion problem in Shiu Pai Terrace.

Increased traffic poses as a menace to the safety of the students in the neighbouring schools.

4.

Noise and air pollution is going to be a serious problem during the construction period.

5.

Landslide in the 70's on the spot of the present construction site render it dangerous for any further constructions.

Share This Page