Annex G
prt on Shiu Fai Terrace Access Road Construction Survey
Questionnaires distributed
Questionnaires returned
% of Receipt
1250
300
24%
No. of Questionnaires
%
Access Through Way to Kennedy Road
243
81%
Access Through Way to Shiu Fai Terrace
36
12%
Cbjection to any construction
No Comment
14
4.7%
7
2.3%
Summary of Opinions
2.
༣.
Traffic in Shiu Fai Terrace is already congested before and after office hours.
Large number of school-buses, private cars etc., are parked along the road before and after school which aggravates the congestion problem in Shiu Pai Terrace.
Increased traffic poses as a menace to the safety of the students in the neighbouring schools.
4.
Noise and air pollution is going to be a serious problem during the construction period.
5.
Landslide in the 70's on the spot of the present construction site render it dangerous for any further constructions.