6.
199
5.
Nature of Work
Classification of
Specified Process under Application
Mode of Operations (Continuous/Batch)
Noxious or Offensive Emissions
Exhaust
Emission
Gas
Point No. Flowrate
(m3/h)
Exit Temperature
(%)
Fugitive mission (Yes/No)
- 12
-
Installed/ Processing Capacity
Mode of Discharge to Atmosphere
Discharge or Chimney Height
(mn)
If NOT discharged
upward freely, please specify
* Delete if not applicable
Silo Capacity (for Cement Works Only)
Total No. of Emission Points
Cross-section of Discharge Exit or Chimney
Width Length
Diameter
(m)
(m)
(m)
t
Highest Building/ Structure within
100m of the Premises
Distance
Height
(日)
(m)