To enable pedestrians to cross the trunk road in

safety, a footbridge is proposed near Sheung Chuk Yuen.

Pedestrians will also be able to cross the trunk road at

the interchange at Fairview Park. For their own safety,

pedestrians will not be permitted to use or cross the

trunk road at grade.

Construction work for this scheme will be carried

out under Phase 3 of the project, Fairview Park to Mai Po

section. In general the road will be built on earth

embankment and about 600,000 cubic metres of fill will be

required for construction of Phase 3. It is proposed to

obtain fill materials from a borrow area at Wai Tsai,

details of which are as shown on Plan No. NH 6154A. On

completion of borrowing activities, cut slopes will be

hydroseeded and suitably landscaped.

In consideration of future maintenance

requirements, an open channel drainage system will be used

to collect and drain stormwater into existing stream

courses.