(a) an up to date set of drawings of the construction

works, which shall include all such alterations

and additions as may, from time to time, be made

to the construction works;

(b)

the times during which each toll gate is open;

(c)

the number of motor vehicles using the road

tunnel, specifying the different classes of such

vehicles, their direction through the road

tunnel, and providing continuous and cumulative

figures thereof;

(d) the amount collected as tolls and the numbers and

prices of toll tickets (if any) issued;

(e)

all accidents and stoppages to traffic therein;

(£) the personnel employed in connexion with the

operation of the road tunnel, including details

as to the nature, location and times of such

employment;

Share This Page