SECTION OF
CANOPY TO
BE REMOVED
N
HARBOUR VIEW STREET
( CONSTRUCTION IN PROGRESS !
BUS TERMINUS
PROPOSED CONCRETE PROFILE BARRIER
是違石屎問撞爛
PROPOSED POTTINGER.
STREET FOOTBRIDGE
£35.00
*PROPOSED
AND STAIRCASCALATO
LEGEND
圖例
000000
PROPOSED ELEVATED STRUCTURE
PROPOSED DEPRESSED STRUCTURE
PROPOSED CARRIAGEWAY
PROPOSED FOOTWAY 'SLAND
PROPOSED / EXISTING AMENITY AREA
EXISTING CARRIAGEWAY
EXISTING FOOTWAY ISLAND
LIMIT OF WORKS AREA
WORKING AREA
擬建竣郁下之絡搆
擬建行人路/安全島
現有行遵道
現有行人路/安全島
施工用规
EXCHANGE SQUARE
PROPOSED KERS LINE
0100000000
WORLD WIDE HOUSE
環球大厦
PB
且
POST OFFICE
郵政總局
-CONNAUGHT BARDEN TO BE USED AS A
WORKING AREA BUT
TO BE REINSIATED TO
EXSTING/MPROVED CONDITIONS ON
COMPLETION OF WORKS,
X
CONNAUGHT PLACE
康樂腑爆
PB
/PEDDER STREET
畢打街器
न
ROAD TO BE CLOSED PERMANENTLY #KAHU 2 4 x
SCHEVE REFERS Į
ROAD TO OF CLOSED TEMPORARILY 將暫時對學不箔路 I SCHEME REFERS)
OBSTRUCTION 10 BE REMOVED
( SCHEME REFERS 1
BETTING CENTRE
CONNAUGHT CENTRE
BE REMOVED
PROPOSED KERD LINE
擬建路邊纜
PILECAP AND PILES OF
FOOTBRIDGE TO BE REMOVED
SWIRE HOUSE
B
B
REORGE'S BUUDIS
CENTRAL
ICE HOUSE STREET 專麻街
S CONNBUGHT PLACE
PROPOSED EXTENSION OF SUBWAY
鏃伸展表行人隧道
PROPOSED RELOCATION OF
TOILETS AND OFFICE
-STOREY CAR PARK
FRIST BAY OF CAR PARK
INCLUDING TOILETS AND
OFFICE TO BE DEMOLISHED
-
JINBURGH PLACE |
MANDARIN HOTEL
STATE SQUARE
Ezt-
GVILDING
KEY PLAN
索引圈
1:5 000
CITY
PROPOSED CONCRETË PROFKË VARRIER
遮打道
CHATUN BEAU
Secretary for
Date
Works
工
NOTES:
ALL DIMENSIONS ARE IN MILIMETRES
ALL LEVELS ARE IN METRES PRINCIPAL MATUMI
THIS DRAWING SHOULD BE READ WITH PLAN
AD HK$190
REVISION
tracad
pret
Rec Highway Enginner
Contrast ne
Tika na.
Project No
1977H
¡ project title 24
JUPGRADING AND DUALLING OF CONNAUGHT
ROAD AND ANCILLARY ROADWORKS
干諾道之改善與擴建雙冰道
沫细
ROADS [WORKS, USE AND COMPENSATION)
CRTINANCE.; CHAPTER 170 }
PECDER STREET UNDERPASS → PLAN
sigh o 號
HH 5189
1.500
HIGHWAYS OFFICE
HIGHWAYS HONG KONG REGION
ENGINEERING
DEVELOPMENT
DEPARTMENT
HONG KONG
A
Page 150Page 151