(1)
(n)
(0)
(i)
(ii)
(ii)
(iv)
3
realigment of the existing eastbound carriageway; addition of a new westbound carriugeway;
provision of a siac read for local traffic; and
construction of slip road connections to the new feeder Icad system on Western Reclamation;
construction of a footbridge across Connaught Road West at Morrison Street, as shown on Plan ito. H5248;
· construction of a footbridge et Tung Hing Lane, as shown on Plan No. 55246, across Connaught Road West and linking to the new bus terminus west of the new Macau Ferry Terminal; and
realigment, modification and construction of kerülines, centrai dividers and segregation islands ca roads and junctions associated with the above works.
2. Rouds to be closed or modified
For the purpose of and/or incidental to the said works, it will be necessary to carry out road mcdifications and closures as listed heremder
(a)
The
(b)
(c)
existing Kerblines on both sides of Cannaught Roud Central End hest will require realignment as shown on Plan Ros. HS246, HA$24,7 und Hi5218;
The central dividers and segregation islands on Connaught Road Central and west will require mcdification es shown on Plan Nos. HAD246, KH 5247 and HM5248;
The segregation island between the new service road south of Kacau Ferry Terminal and the eastbound carriageway of Connaught Road Central from the exit of the new Macau Ferry Terminal to the exit of the Kurray Road multistorey carpark will be modified es snow on Plan ho. 247. New segregation islands will be added between the new westuound carriageway, eastbound side road, trai only passageway and westbound side road of Connaught Road Central
end est from the junction of Han Wa Lane to the junction of Des
Voeux Road Test, as snow on Plan Nos. 247 and HH 5248;
/(2)