EXP: EMBASSY PARIS

33 1 42669142 343 1986-07-31 12:46 63-72 5 #4

tul.3 31 'Ou 10:28 ELF.DIM,EQUIPT.SCE.CENT./847110

MONDAY, 4 AUGUST

L.

P.AA4

8:19

-

9:00

9:19

0:35

-

T

g

-

DEPARTURE OF THE COACH FROM THE MERCURE HOTEL (FIVE PLACES IN THE COACH WILL BE AVAILABLE FOR THE JOURNALISTS NAMED IN YOUR TELEX OF 29.7.1986)

ARRIVAL AT THE GRAVELINES NUCLEAR POWER PLANT

(ALL THE JOURNALISTS ARE AUTORIZED TO ASSIST AT THE GENERAL PRESENTATION OF THE GRAVELINES SITE)

WELCOME BY MR.

CAILLAULT

PROJECTION OF A FILM (IN ENGLISH) ENTITLED **NUCLEAR PRESSU- RIZED WATER REACTOR''

PRESENTATION FO THE INTEGRATION OF THE GRAVELINES PLANT IN THE REGION AND THE OPERATION ORGANIZATION (WITH AUDIO-VISUAL SUPPORTS) BY MR, PRUVOT

PROJECTION OF A FILM (IN ENGLISH) ENTITLED 'A GREAT INDUS- TRIAL ADVENTURE'

PRESENTATION OF MOCK-UPS OF THE GRAVELINES NUCLEAR POWER STATION AND THE PUBLIC INFORMATION CENTRE

STATION TOUR (THE FIVE JOURNALISTS NAMED IN YOUR TELEX ARE AUTORIZED TO FOLLOW THE DELEGATION INSIDE THE PLANT) LUNCH

PRESENTATION OF ENVIRONNEMENTAL ASPECTS (BY MR. PRUVOT AND MR. POLLIER)

SAFETY IN OPERATION AND EDF CONTINGENCY PLANS IN CASE OF ACCIDENTS (PRESENTATION BY MR. PRUVOT)

- LOCAL AUTHORITIES CONTINGENCY PLANS FOR POPULATION PROTECTION

9:55

P

10130

11:00

12:30

14100

14:45

15/15

16:15

-

PUBLIC INFORMATION (PRESENTATION BY MR. POLLIER)

17:15

VISIT TO THE LABORATORY FOR ENVIRONNEMENT MONITORING

18/30

-

-

MEETING WITH LOCAL ADMINISTRATION AND PRESENTATIVES

WITH LOCAL

19:30 DINNER AT THE ARSENEL

DEPARTUæg cao tub kaliATEL MATEI /TEL (16) 1097.9.25 › NEAR LILLE AIRPURTY ACCOMPANIED BY AN VAILLAULĪ MK FEGER AND MR CROCHON

www

TUESDAY: 5 AUGUST

J

6/15 DEPARTURE FROM THE HOTEL

7:00

8:10

-

FLIGHT TO LILLE TO LYON (NO. 5571 AIR-INTER)

ARRIVAL AT LYON-SATOLAS AIRPORT

COACH TRANSFER TO BUSEY (THE COACH WILL BE AVAILABLE FOR THE JOURNALISTS NAMED IN YOUR TELEX OF 29.7.1986)

ALL THE JOURNALISTS ARE AUTORIZED TO FOLLOW THE DELEGATION IN THE TRAINING CENTRE

A

Share This Page