The Secretary for Lands & Works
Dear Sir,
Undated
(8)
Objection and suggestion concerning PWP Item No. 116 TH Intersection of Castle Peak and
wai Chung Roads Improvement Stage 11
We object to the execution of the captioned project because the stairway
of the footbridge is too long. Its length should be reduced to half of the
proposed length as shown on the plan. The stairway should not be too wide and
should be built right in the middle of the existing road in order not to affect
the loading/unloading of goods and the business of the shops on both sides.
It is our wish that you would pay attention to the plight of the shop
operators and consider accepting our request.
:
Yours faithfully,
LEUNG Ping
Owner of Shop No. 7
FUNG Lin-tai
Owner of Shop No. 10,
G/F., Tak Cheong Building