As regards repair plans, Blocks 1, 2 and 3 will

require routine maintenance as might be expected in buildings

of that age. Work has already started on this. Blocks 4, 7

and 8 require more extensive repairs which are already in

hand. Block 6 was in need of major renovation and repair, and

that work will be completed by May of this year. The

opportunity has been taken to bring the block up to present

day standards with upgraded services including a complete

rewiring, improved drainage and a communal TV aerial system.

Based on the experience of repairing Block 6, we

have discovered that the work involves a great deal of

inconvenience to tenants and is also very costly and

time-consuming. In the light of this, it has been decided to

redevelop some blocks although it would have been perfectly

possible to repair them.

Blocks 9, 10 and 11 are situated in one corner of

the estate, are joined together and form a very suitable area

for redevelopment. The opportunity will be taken to use the

latest design of blocks and to improve the layout and

facilities in the area. On the grounds of cost-effectiveness

and for the convenience of tenants, it is also a better

solution to redevelop rather than repair Block 5. A phased

programme of redevelopment will therefore be undertaken over

the next few years to replace Blocks 5, 9, 10 and 11.

As I have already emphasised, the structural safety

of these blocks is not a matter of concern.