1

- 2 -

However, such clearance operations are but short term measures. The basic problem of the old drainage system in low-lying areas will remain unless longer term solutions are introduced. The longer term solution involves the widening and raising in level of Shau Kei Wan Main Street and at the same time replacing the present drainage system by one of adequate capacity. This is dependent on the redevelopment of the remaining properties in the area, the timing of which is uncertain. However, the feasibility of replacing the critical segment of the drainage system servicing this area is being examined with the view to effecting a significant improvement in the medium term.

Share This Page