(a) Chi Ma Wan This is an existing

pa

institution run by the Correctional

Services Department as a Detention Camp

under the Immigration Ordinance and is

Some improvement

immediately available.

and alteration works would be required

but they should not delay the use of the

camp as the works could be done even

after the camp is in use. About 3,500

refugees can be accommodated in its two

sections.

الوريا

(b) Hei Ling Chau A site for the construction

<

of a closed camp for 2,500 is available.

The lead time required for the construction

of this

camp is 9 12 months but it could

J

be made available by phases, the anticipated

completion date of the first phase being

March 1983, with the whole camp being ready

by September 1983. A further 500 could be

accommodated in a nearby institution.

18.

In sum the arrangements set out in paragraphs

15 and 16 above would provide accommodation for the

following number of refugees by the date set out below :