TABLE 8-5

ORDER OF MAGNITUDE COST ESTIMATE

CONFIDENTIAL

Unit

Total Cost

Cost Item

Quantity

Unit

Cost

(HK$ in '000)

SITE PREPARATION

aLs

b

(1) Mobilization and Demobilization

Lsa

70,279

(2) Clear and Grub (borrow area)

Lsa

2,000

(3)

Excavation

Rock (drill and blast)

60,550,000

26.02

1,575,511

Soil & Rippable rock

61,104,000

m3

11.51

703,307

Marine deposit (dredged)

32,482,000

m3

18.63b

605,140

(4) Embankment

=

=

Quarry run

76,367,000

m

5.76

439,874

Armor and underlayers

Select fill

4,164,000

41,652,000

3

15.59

64,917

3

m

4.39

182,852

Bedding layer

16,397,000

3

m

2.27

37,221

Subtotal Site Preparation

lump sum

disposal within 40km

3,681,101