TABLE OF CONTENTS

CONFIDENTIAL

TAB 1

TERMS OF REFERENCE

TAB 2

SUMMARY OF FINDINGS & ISSUES

TAB 3

RUNWAY CONFIGURATION/ALIGNMENT

TAB 4

FURTHER

STUDIES: METHODS OF REDUCING NOISE IMPACT ON THE NEW TERRITORIES

TAB 5

TAB 6

NEW TERRITORIES DEVELOPMENT CONSULTANTS (NTDC) REPORT

APPENDIX A: ROYAL OBSERVATORY REPORT:

A PRELIMINARY REPORT ON THE METEOROLOGICAL CONDITIONS IN THE DEEP BAY AREA

TAB 7

APPENDIX B: OPERATIONAL STUDIES

TAB 8

APPENDIX C: CONSTRUCTION STUDIES

TAB 9

APPENDIX D: DERIVATION OF NOISE CONTOURS

TAB 10

(1)

(2)

ATTACHMENTS:

Royal Air Force Comments Marine Department Comments

i

CONFIDENTIAL

Share This Page