Subject

Purpose

Progress made & Present Position

Next Quarter Targets

13. Land Use and

Transport Optimisation

Study

TRAN 4/01/13 II)

14. Junk Bay

Development

Study

(TRAN 4/02/12 IV)

To develop a computer based model-and use in determining the Land Use- Transportation pattern that will yield the greatest benefit accord- ing to stated criteria.

plan and programme for Junk Bay New Town; identification and detailed planning of an initial development area in the new town; strate- gic guidelines for recreation, conservation and urban development in the hinterland; and data

(a) Negotiations with consultants

have been satisfactorily concluded, the Study Director post approved and the Study Director appointed.

(b) The Steering Group under new

Chairmanship met with the consultants attending on 16.4.81

(c) A programme of work was agreed

and preparation made for providing the input information required according to that programme.

The

Draft outline development Junk Bay consultants concluded their

work based on an assumed population of 300,000 and the provision of an MTR link with the issue of the draft final report on 13.4.82. MTR Corporation has provided the necessary input to the Junk Bay Study and is processing the proposal through the Corporation Board. LDPC approval of the Junk Bay project will be sought before seeking ExCO approval of the MTR element of the

on population capacity

and development costs for project.

input to territorywide strategic planning

(a) Obtain approval to

the methodology being followed by papers submitted through the Workin Group on Developmen Strategy Formulat to LDPC.

(b)

Proceed with the building of the Li model and monitor progress

thereon.

CONFIDENTIAL #

(a) Process the propos

through TPCC.

(b) Participate in

processing it thr LDPC.

(c) Prepare an EXCO

paper and process it through the system.

CONFIDENTIAL