ACTIVITIES
CONSTRUCT AND EVALUATE TEST FILL
GEOTECHNICAL EXPLORATION
BATHYMETRIC SURVEY
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
+
R.O. OCEAN AND METEO. STUDIES
+
ENVIRONMENTAL STUDIES
Figure 21 presents the development programme currently recommended by the Consultants for the replace- ment airport. The pacing items external to the airport implementa- tion schedule that are critical con- straints on the development pro- gramme include the EXCO decision to proceed with further planning work for the replacement airport. A second pacing item is the EXCO decision to proceed with construc- tion by the end of 1982. The other external pacing operations are the completion of both the fixed cross- ing and an airport access roadway. These are scheduled for the end of 1986, which is consistent with the development programme shown in the schedule.
FINANCIAL STUDIES MASTER DEVELOPMENT PLAN a.
I
I
DESIGN-PHASE1
TENDER AND AWARD-PHASEI a.
MOBILIZATION a.
DREDGE PHASE I-SEAWALL b.
DREDGE PHASE I - RWY/TWY AND PLACE BEDDING COURSE EXCAVATE CHEK LAP KOK AND LAM CHAU - PHASE a C.
CONSTRUCT PHASEI - SEAWALL
I
+
+
U
1
PLACE FILL FOR PHASE - RWY/TWY
DREDGE AND PLACE FILL
FOR BALANCE OF PHASE I
CONSTRUCT UNDERGROUND
STRUCTURES
I
I
1
DRIVE PILES FOR STRUCTURE FOUNDATION
CONSTRUCT BUILDINGS
a
F
+
FINE GRADE SITE
J
PAVE PHASE! RWY/TWY
DRAINAGE STRUCTURES, PEOPLE MOVER, UTILITIES
TRANSFER FROM KAI TAK
J
DESIGN - PHASE II
TENDER AND AWARD- PHASE II
CONSTRUCTION - PHASE ›
I
CONSTRUCTION - PHASE lb
T
1
RELATED ACTIVITIES
ACCESS ROAD TO AIRPORT (STAGE || NORTH LANTAU DEVELOPMENT) LANTAU FIXED CROSSING - CONSTRUCTION (BASIC 4 LANES)
EXCO APPROVAL TO CONTINUE WITH FURTHER PLANNING AND INVESTIGATION WORK
EXCO DECISION
TO CONSTRUCT
REPLACEMENT AIRPORT
a) DENOTES ACTIVITIES ON CRITICAL
PATH FOR STARTUP OF OPERATIONS
b) 24,000 M PER 24 HR DAY WITH FOUR 8 M
CLAMSHELL. DREDGES HAULED TO DISPOSAL IN THIRTY 500 M DUMP SCOWS
c) 60,000 M PER 24 HR DAY. REQUIRES TEN 6 M
SHOVELS LOADING FIFTY 65 TON TRUCKS.
+
TENANT SITES AVAILABLE L FOR CONSTRUCTION:
PHASE I (INCL. FUEL FARM) AND PHASE III
STARTUP OPERATIONS
LEGEND
TENDER AND SELECTION PROCESS ACTIVITY
INTERMITTENT ACTIVITY
Figure 21- Proposed Development Schedule
36
RIP PARSONS OVERSEAS COMPANY • WILBUR SMITH & ASSOCIATES
IN WARD PARTNE
• CIVIL AVIATION A