Agenda for discussion in Hong Kong,
Nuclear Power Station.
GPC to update Mr. Stones on the progress made by the Reviewing Board in Beijing.
CLP to update Mr. Chen Gang on Status of the Report in Hong Kong and the UK.
Consultations between CLP and GPC on the question of guarantees
for loans.
Sale of electricity by the Guangdong Power Company to Hong Kong.
A request to CLP to present an introduction and material on the loans obtained for Castle Peak 'B', so that comparisons could be made.
Discussions on:
escalation;
interest on loans;
basic cost of equipment;
fuel costs;
etc.
As CLP had easier access to information, CLP would be requested to do most of the presentation,
GPC to present the progress of work in connection with site selection.
(g)
(h)
(i)
Chart out
(j)
Prepare an agenda for the next Executive Committee Meeting.
different documents such as
Articles of association, contract for the sale of electricity etc.
The actual details should be worked out at a later stage.
The papers previously submitted by GPC in this connection are too brief and requires revising.
Exchange views on Contract Strategy and Project Management. Mr. Chen suggested that for the present, attention should centre around a method whereby CLP and GPC could retain overall control of the project.
Further Supply.
The few basic questions should be agreed and settled by the two sides. If agreement could be reached, the Draft Agreement
should be signed.
Training of GPC personnel.
Mr. Chen wished to thank Mr. Stones and CLP for the training programme which was very carefully thought out. GPC would inform CIP of the date of arrival of these engineers.