SAMPAGUNGSANKOSTEORIEK PRO Com Janamu, ka mazachstan rezeki dekke te don AZ UMA VEZ MA
- 7
(d)
Transportation;
(e) Electricity supply for construction and security;
(£)
(9)
(h)
(i)
Layout and area of the station, construction site, living and community areas;
Local sources of construction materials;
Effect of nuclear power station
on environment and effect of environment on nuclear power station;
Evacuation plans under hypothetical contingencies;
(3) Estimate of investment of the fore-mentioned items;
(k)
Other matters.
iii. Equipment Subcommittee
The Equipment Subcommittee will be responsible for carrying out studies and investigations listed below and for drafting the relevant parts of the feasibility report under the guidance of the Management Group.
(a)
(b)
(c)
(a)
International
regulations
with associated
the safe
operation of nuclear power plant;
All types of nuclear reactors, including gas cooled, light and heavy water reactors;
All
of
the
technology
associated
with
these
aspects reactors and the advantages and disadvantages of each;
Possible employment of services of specialists in reactor technology;
(e)
Turbo-generators and other auxiliary equipment with the recommended reactors;
associated
(f)
Contracting methods;
(9)
Re-cycling of fuel;
(h)
Equipment costs;
(i) Other matters.
iv. System Design Subcommittee
The System Design Subcommittee will be responsible for carrying out the studies and investigations listed below and for drafting the relevant parts of the feasibility report under the guidance of the Management Group.
$...