CFL

(a) 12MB will attery to their programme which 'comycines the following

for every bus 1.

(b)

(c)

(3)

(うえ)

(iii)

The servicing

a "her vicing" at least once every month, will comprise an examination of the ruling and operating equipment (e.g. brakes, sicering, door mechanian, etc.) and the appointments (eig, seate, handrails, etc.) and the rectification of any faults found;

a "minor dock" at least once every year. A "minor dock"

will comprise the examination of vital components, to

ensure that the bus is structurally sound and roadworthy;

an overhaul prior to examination by the Commissioner for a Certificate of Fitness. (The Commissioner and KB will

prepare a schedule of the dates when Certificates of Fitness. will be required for each vehicle.) An overhaul will

comprise the dismantling, examination, repair, or replacement of moving and structural parts of a bus.

KMB will so regulate the maintenance and servicing of buses as to ensure that, by mid 1981, at least 75% of the licensed fleet is

available at all times to operate the public omnibus service

required by the Ordinance and the franchise.

KMB will continue to keep up to date records of repairs,

maintenance and overhaul of each bus;

(a) KMB will continue to adhere to their formal system for drivers to

report defects with clear lines of communications with the repair

teams. Written records of the defect report and the action taken

to rectify the defect will be kept. (This will apply to all vehicles including buses parked overnight at termini and on streets);

(e)

HB will continue their system of removal from the depots all

scrapped engines, transmissions, and other components and waste

materials. Buses that have been scrapped will be removed to

naximige the space within the depots for the maintenance and

parking of serviceable vehicles;

/ (0)

Share This Page