orders worth about £500m have been placed by CLP, with the UK over

the past 2 years. CLP and the Hong Kong Government need to be satisfied

about the reliability of equipment and electricity supply made available

within a specified time. CEC have a good track record in Hong Kong in terms of both the high availability of output from their machines

and the speed with which they can construct a station.

which

b) GEC has already supplied the non nuclear islands for several PWR

stations around the world and has experience of joint collaborative

ventures. Exploratory discussions have already taken place with Framator (the French nuclear supplying company) in the context of a Korean joint

venture and there is no reason to presume that an arrangement could not

be worked out in the context of Guangdong,

c) The Peking authorities have recently told our Embassy that the

coal fired power stations "earmarked" for the UK are now unlikely to

proceed. The Embassy have already told the Chinese that in that case

some compensating deal on power stations would be looked for and the Cuangdong project has been mentioned in that context.

d) Both the Chinese provincial and Peking authorities and ourselves

are keen to further the closer development of Hong Kong and Guangdong. A collaborative venture on the nuclear power station would give tangible

effect to that desire and should be placed in the wider context of

Anglo-Sino relations.

RECOMMENDATION

20 It is considered that there is a good basis for the UK continuing to

press CLP and the Chinese for a greater participation in the Steering Group

and ultimate collaboration in a joint venture.

21

It is therefore recommended that:

слова

We should with the ICG to support us in

a) (UK Departments and Hong Kong Government should stress to CLP