B.
CONFIDENTIAL
Meinorandum of Understanding (22.2.79)
(again "enabling" document) signed between
The Kwangtung Provincial Economic and Technical Liaison Office with Foreign Countries.
+
The Kwangtung Provincial Electricity. Bureau.
AND
GEC Gas Turbines Limited
+
Wata Industrial Development Corporation
(currently being registered).
2nd Meeting arranged from about 22/3 onwards and a Contract could be signed (or signed at a 3rd meeting) provided payment and related terms can be agreed.
3
3.
4.
5.
Notes
*
*
"Better" chance with the "nuclear" delay?..
Similar Gas Turbine plant as being pro- vided to C.L.P. (H.K.) and thus training advantages close to hand.
Hydro-Electric Power
B.
GEC. investigating a hydro-electric power pro- ject for east Kwangtung, 5 x 10M.W. units.
Modernisation of railway from Shum Chun to Kwangchow.
A.
It is not clear exactly what the Chinese want to do or when, but they have indicated a preference for similar equipment etc for modernisation as Hong Kong may decide.
:
Miscellaneous enquiries being looked into.
A.
B.
Modernisation, under a compensatory type pro- posal, of a Lift Factory in Kwangchow.
Ditto
Telecomms. Factory.
C.
Integrated circuit plant.
CONFIDENTIAL