DESKBY PEKING 080001Z

FM BTC HONG KONG 071020Z DEC 78

TO IMMEDIATE DO I

TELEGRAM NUMBER INDUS 217 OF 7 DECEMBER

INFO IMMEDIATE PEKING, F C O, DOT.

329

YOUR INDUS 312: COAL FOR HONG KONG.

TRED (2)

FED

Puso

HKQGD

THE HONG KONG STANDARD REPORTED ON 5 DECEMBER THAT THE CHINESE

DELEGATE TO THE CEPSI CONFERENCE HAD SAID THAT A DELEGATION

FROM KWANGTUNG WAS MAKING PREPARATIONS TO MEET CLP OFFICIALS TO

DISCUSS ''CONCRETE DETAILS'' INCLUDING THE TARIFF AND METHODS OF

INSTALLATION FOR A POWER SUPPLY VIA SHUM SHUN TO KWANGTUNG

PROVINCE.

2. SIDNEY GORDON CONFIRMED TODAY THAT CLP ARE MAKING ARRANGEMENTS

TO RECEIVE A DELEGATION LED BY THE HEAD OF THE KWANGTUNG ELECTRICIT

BUREAU IN ABOUT TEN DAYS TIME. THE KWANGTUNG AUTHORITIES HAVE

INFORMED CLP (VIA ONE OF THEIR SENIOR CHINESE MANAGERS, WHO WAS ON HOLIDAY IN CANTON), THAT THEY WILL REQUIRE ONE MILLION UNITS

OF ELECTRICITY PER DAY FOR TRANSMISSION AT 110 KV BETWEEN SHUM CHUN

AND SHEK LOONG. THIS SUPPLY, WHICH GORDON CALCULATES AS THE EQUIVALENT OF A DELIVERED 50 MW AT SHUM CHUN IS REQUIRED WITHIN

3 MONTHS. THE CHINESE HAVE ALSO INDICATED THAT IN THE LONG RUN

(IE ABOUT 2 YEARS) THEY WOULD REQUIRE A 220 KV CONNECTION BETWEEN

SHUM CHUN AND SHEK LOONG BUT THEY DO NOT REPEAT NOT THINK THAT

THEIR TOTAL NEEDS WILL REQUIRE CLP TO ADVANCE ITS INSTALLATION

PROGRAMME FOR NEW GENERATING CAPACITY.