AA2 PLEASE REFER TO VOLUME 4 SECTION 1 OF TENDER MEMORANDUM AND SECTION 4 WHERE PROVISIONAL SUMS ARE DISCUSSED. SEE IN PARTICULAR SECTION 3 PARA 2.0 AND PARA 4.0 FOR REASONS GIVEN IN THE TEXT NOT POSSIBLE UNTIL SURVEYS, SOIL INVESTIGATIONS, TOWER POSITIONS AND ROUTES COMPLETED, TO BE MORE PRECISE ON EXACT COSTS. PROVISIONAL SUM IS THEREFORE GIVEN AS SHOWN IN VOL 1 SECT 4. THE FULL LIST

IS AS FOLLOWS

CROSSOVER OF 400/132 KV (ONE ONLY)

LINES BETWEEN POWER STATION AND TERMINAL TOWERS AS YET UNDEFINED BUT POSSIBLE REQUIRING SPECIAL TOWERS OR GANTRIES

-EXTRA STEELWORK FOR TOWER EXTENSIONS

ADDITIONAL FOUNDATION WORK, INCLUDING NON-NORMAL TYPE FOUNDATIONS, ROCK EXCAVATIONS, DRAINAGE CHANNELS,

TIMBERING AND PUMPING

ADDITIONAL EARTHING REQUIRED TO ACHIEVE RESISTANCE MAKING GOOD EXISTING ROADS DAMAGED BY CONSTRUCTION ACTIVITIES AND STRENGTHENING BRIDGES AND CULVERTS LANDSCAPING TOWER SITES AND PLANTING SHRUBS

PAINTING TOWERS

SOIL INVESTIGATION AT TOWER SITES

CASTLE PEAK POWER STATION CONNECTIONS

CC4 FOR BASIS OF CIVIL ENGINEERING DESIGN SEE VOL 2 PARA 2.2.6

E E FOR DESCRIPTION OF PROJECT MANAGEMENT ORGANISATION SEE

VOL 1 SECTION 6

DD1 SPARES. PLEASE REFER TO VOL 1 SECTION 2.2.2. FOR GENERAL

COMMENTS. THE PROVISIONAL SUM COVERS ALL SPARES

GS1 PLEASE REFER TO VOLUME 1 SECTION 2.1.2 FOR PROVISIONAL

SUM AND VOLUME 2 SECTION 2 FOR SCOPE OF WORK

KK PLEASE REFER TO VOLUME 1 SECTION 2.1.9 WHERE WE OFFER TO INVOICE AT COST OCEAN FREIGHT AND INSURANCE. IN SAME SECTION WE OFFER LIKEWISE TO CHARGE AT COST THE DELIVERY

FROM CIF HONG KONG TO SITE.

LL

PLEASE REFER TO VOL 1 SECTION 7. B3 CONDITIONS OF CONTRACT CLAUSES 22 AND 24 AS AMENDED IN SECTION 7.