CONFIDENTIAL ##
機密
Hong Kong Electric Co. Ltd.
Pattern of Expansion
Annex A
Year
Existing
Maximum demand (megawatts)
Installed capacity
megawatts)
1968
251
60
1969
274
60
1972
370
125
1973
423
125
1974
442
11 (gas turbine)
1975
460
125
1976
519
125
1978
654
125
(2 x 25)
50 (gas turbine)
Present capacity
Planned
1979
806 megawatts
723
125
1980
794
125
1981
866
125
Full capacity
of existing station
1,181 megawatts
at Ap Lei Chau
Proposed
1982
1984
1986
1988
1990
1992
940
250 )
1,105
250
1,294
250
dual fired
1,513
250
1,768
350
2,065
350
2,881 megawatts
Existing, planned
and proposed capacity
(* oil fired steam generators, unless
otherwise indicated)
CONFIDENTIAL #2
機密