HOFO @27/21

PP D GI

R.

HKK164/1

2 JUN 1978

INDEX

GR 2885

.CYPHER/CAT A

No

FM BTC HONG KONG 211027Z

CONFIDENTIAL

R

Y

Taken

NO DISTRE

RD JK & GD STRUTION Is of IN

Mark is retrieving

A un portion skrifuz

мотикони

لله

TO PRIORITY D.0.1 TELNO.INDUS 70 OF 21 JUNE 78.

154

1

TRE (2)

227

#k+q

See 160

12.7

FOR HAVELOCK EPT.

YOUR INDUS 121 : HONG KONG ELECTRIC (HKE).

1. I HAVE HAD AN INFORMAL DISCUSSION WITH S.L. CHEN, OF HONG

KONG ELECTRIC WHO HAS BEEN MAINTAINING CLOSE TOUCH WITH DR GOSLING

OF BICC. CHEN SAID THAT, IF THEIR APPLICATION FOR A SITE IS FINALLY GRANTED HKE WOULD WELCOME A BRITISH PACKAGE OFFER FOR TRANSMISSION EQUIPMENT. THEY WOULD LIKE OUR OFFER TO BE IN HONG KONG DOLLARS AND WOULD BE PREPARED TO CONSIDER U.K SF6 SWITCHGEAR PROVIDED WE CAN DEMONSTRATE ITS TECHNICAL ACCEFTABILITY

2. CHEN CONFIRMS THAT AT PRESENT HKE WOULD WANT A 275 KV LINK BETWEEN A NEW POWER STATION ON LAMMA AND THEIR THREE EXISTING 132 KV SUBSTATIONS ON THE ISLAND. THEY SEE NO REASON FOR IT TO BE AT 430 KV EVEN IF THERE WAS TO BE A FULLY INTEGRATED

LINK-UP WITH CLP'S NEW SYSTEM FROM HKE'S MT PARKER SWITCHING

S.L. CHEN SAID THAT IF A STATION ACROSS THE LYMUN GAP. LINK-UP WITH CLP WAS LIMITED TO A RESERVE SHARING ARRANGEMENT IT WOULD PROBABLY BE BETWEEN NORTH POINT AND HOK UN (WHERE THE TWO SYSTEMS ARE CLOSEST TOGETHER) AT 132 KV WITH THE NECESSARY INTERBUS TRANSFORMER.

3. IT WAS CLEAR THAT HKE CAN GIVE NO FIRMER INDICATION OF

THEIR REQUIREMENTS UNTIL THEY HAVE RECEIVED A FINAL GO-AHEAD

FOR THE LAMMA ISLAND SITE. MEANWHILE S.L. CHEN HAS UNDERTAKEN TO LET ME HAVE DETAILS OF THE COAL HANDLING PLANT STILL REQUIRED

LE THE POINT AT WHICH THE MITSUBISHI OFFER BEGINS.

4. I HAVE ARRANGED FOR US TO CALL ON S.L. CHEN AND JOHN PEACOCK

AT 11330 ON THURSDAY JULY 6 AND TO LUNCH WITH THEM AFTERWARDS.

MARCH

Share This Page