2.2 BEI MAY PROVIDE THE SERVICES THROUGH THE STAFF AND OTHER RESOURCES OF THE CENTRAL ELECTRICITY GENERATING BOARD OF THE UNITED KINGDOM (HEREINAFTER REFERRED TO AS QUOTE CEGB UNQUOTE) R ANY OTHER ELECTRICITY BOARD OF THE UNITED KINGDOM, AND THE EXPRESSION QUOTE BEI PERSONNEL UNQUOTE SHALL IN THIS AGREEMENT BE TREATED AS INCLUDING CEGB PERSONNEL AND THE PERSONNEL OF ANY SUCH OTHER ELECTRICITY BOARD.

2.3 TO ENSURE EFFECTIVE CO-ORDINATION BETWEEN BEI AND KESCO, BEI WILL APPOINT A RESPONSIBLE OFFICER FOR THE DURATION OF THIS CONTRACT WHO WILL SEE THAT THE RANGE OF RESOURCES AVAILABLE TO BEI IS EFFECTIVELY USED.

3. DURATION AND TIME LIMIT OF SERVICES

3.1 THE BEI SERVICES ARE BASED ON A COMMISSIONING OF THE SECOND 350 MW UNIT IN MARCH 1983 AND BEI'S OBLIGATION TO PROVIDE THE SERVICES HEREUNDER WILL CEASE SUBJECT TO HEREINAFTER PROVIDED AT THE END OF SEPTEMBER 1983 NOTWITHSTANDING THE OPERATION OF

IF THE COMMISSIONING ARTICLE 17 OR ANY OTHER DELAYS IN COMMISSION.

OF THE SECOND 35 MW UNIT IS DELAYED FOR ANY REASON, BEI AND KESCO WILL CONSULT TOGETHER, AND WITH THE SECRETARY OF STATE FOR INDUSTRY IF NECESSARY, AND SUBJECT TO AGREEMENT BETWEEN THE PARTIES WILL ARRANGE A REPHASING OF THE BEI SERVICES SO THAT THIS AGREEMENT CAN BE EXTENDED TO SIX MONTHS BEYOND THE COMMISSIONING DATE OF THE SECOND UNIT.

4. SERVICES ON THE DESIGN AND CONSTRUCTION OF THE POWER STATION THESE SERVICES RELATE TO THE TECHNICAL ASPECTS OF THE POWER PLANT, EQUIPMENT AND COMPONENTS, INCLUDING THE FOLLOWING ITEMS: (A) STATION LAYOUT, SITE ACCESS, FULE AND EQUIPMENT UNLOADING FACILITIES, COOLING WATER INTAKE AND OUTFALL LOCATIONS, CONDENSER LEVEL DETERMINATION.

(B) TURBINE-GENERATORS AND AUXILIARIES, TURBINE-GENERATOR FOUNDATIONS, STEAM CONDENSING PLANT AND AUXILIARIES, FEED HEATING PLANT AND FEED WATER STORAGE, NOISE CONTROL, SILENCERS.

(C) MAIN AND AUXILIARY BOILERS, DRAUGHT PLANT, PRECIPITATORS; BOILER STEELWORK, OIL FIRING EQUIPMENT, COAL MILLING AND FIRING EQUIPMENT, BOILER FEED PUMPS, FEED WATER TREATMENT PLANT, CONDENSATE POLISHING PLANT.

(D) HIGH AND LOW PRESSURE PIPEWORK, MAIN AND AUXILIARY CIRCULATING WATER SYSTEMS, COAL HANDLING AND STORAGE PLANT, OIL HANDLING AND STORAGE PLANT, ASH AND DUST

HANDLING PLANT, CRANES, LIFTS, FIRE PROJECTION EQUIPMENT, HEATING AND VENTILATING EQUIPMENT, COMPRESSORS AND COMPRESSED AIR SERVICES, HYDROGEN AND CHLORINE PRODUCTION EQUIPMENT AND GAS STORAGGE

WORKSHOPS.