STATEMENT OF ESTIMATED AND ACTUAL EXPENDITURE AND APPROPRIATIONS-IN-AID FOR THE YEAR ENDED 31 MARCH 1977

Heads and Subheads

69

Public Works Non-Recurrent:

Original Estimate

Actual

$

$

Over the Estimate

Special/ *Virement

Under the Supplementary Warrant

Estimate

Votes

Nos.

Heads ar

$

$

Engineering continued

Highways: Kowloon--continued

Footbridges and Subways

Subheads

885 Footbridge and public light bus

terminus at Choi Hung Road near Tai Shing Street

886 Subway under Nathan Road at

Nelson Street

600,000

887 Footbridge over Nathan Road at

Soy Street

888 Subway under Nathan Road near

Haiphong Road

69

Public W

Engineer

Highway

Roads-

Subhead:

917 Im

300,000

7

bu

600,000.00

918 Ma 919 Ph

La

Ke

920 Im

1,200,000

1,200,000.00

889 Subway under Nathan Road at

Argyle Street

2,400,000

2,400,000.00

890 Grade separated pedestrian crossing

on Ching Cheung Road adjacent to N.K.I.L. 3738

Miscellaneous

895 Road link between Norfolk Road and Suffolk Road adjacent to K.C.R.- resumption

896 West Kowloon area traffic control

scheme part II, implementation

dra

New De

208,801.12

208,801.12

380,000

18

950 Sh

sta

951 Sh 952 Sa

dr:

nu

953 Hi

32,000

5,100,000

10,218.50

1,955,307.43

21,781.50

3,144,692.57

Miscella

*897 Chuk Yuen Road extension

500,000

7

898 Updating the major transportation

studies

975 Sil

900,000

899 Slope stability and other safety

investigations

200,000

895,222.02

476,095.29

4,777.98

985 Tr

900 Consultants' fees: 1973-74

programme

10,000

31,700.00

276,095.29

21,700.00

300,000

25 & 37

986 M

25,000

16

901 Consultants' fees: 1974-75

8838842

00

00

00

00

programme

200,000

79,113.79

120,886.21

902 Road link between York Road and

Norfolk Road

280,000

125,171.20

154,828.80

00

903 Remedial earthworks at Sau Mau

Ping Road

1,364,661.62

3,300.40

1,364,661.62

3,300.40

1,370,000

220,000

7 & 43

987 W 988 M

se

33

of

989 M

th

904 Reconstruction of railway bridge

across Boundary Street

New Territories

Roads

905 New Lai Chi Kok Hospital inter-

change and Kwai Chung Road widening

906 Castle Peak Road improvements,

Castle Peak to Ping Shan: stage II: 907 New Territories circular road

improvements-realignment of Tai Po Road under Kowloon-Canton Railway at 174 M.S.

908 Improvements to Tai Po Road

from Hong Kong Chinese University to Tai Po causeway level crossing: land acquisition

909 Improvements to Tai Po Road from

Ho Tung Lau to Tai Po causeway level crossing: construction

110,000

86,263.11

227,000

23,736.89

227,000.00

120,000

23

2,100,000

1,234,709.67

865,290.33

Appropr

70 Public

and Pul Authori

500,000

188,030.15

311,969.85

I Urb:

3,750,000

910 New Territories trunk road system,

investigations

300,000

3,948,954.91

180,989.78

198,954.91

250,000

42

119,010,22

Subhea 450 W

911 Junk Bay Road, stage I, phase II

(Sau Mau Ping to Anderson Road) 912 South Lantau Road widening, stage II -Cheung Sha to Keung Shan- Site investigation and resumption

451 H

913 South Lantau Road widening, stage II,

phase I-Cheung Sha to Tong Fuk

452 T

5,000,000

5,000,000.00

914 Clear Water Bay Beach Road 915 High Island roads-improved

standards

916 Access road to Fanling Police

Training Unit adjacent to Fanling Railway Station

453 P

720,000

720,000.00

454 T

381 38E◄ÕRŌTAÕ

es

es

ΟΙ

00

00

B

01

84

Page 105Page 106