CONFIDENTIAL

PART J UPKEEP

/DFM/DG Ship's/DGW (N)/CED to confirm/amend this section as appropriate.

In

addition, DFM to quantify any changes required in existing local shore maintenance facilities and staff numbers/specialisations when new vessels replace present TONS.7

1.

Availability, Reliability and Maintainability

DFM to provide statement on availability after clarification of

the Upkeep Cycle7

b.

Ship systems and equipments are, where applicable, to be provided

with the necessary facilities to enable Command System Checks to be

carried out. These checks are defined as those usually performed on

a daily basis by which systems and manpower can be exercised in a co-

ordinated and efficient manner, such that fighting capabilities and ship

characreristics are demonstrated to the Command, confidence is established,

systems avilability is speedily confirmed or defects revealed. The checks

may be limited by operational constraints and test facilities. They should

consist of:

C.

(1) Audible, visible and physical qualitative tests capable of

being carried out within a watch system but normally on a daily basis:

and

(2) Selected quantitative overall system test used in the progressive

assessment of fighting capabilities and ship characteristics.

Recommendations are to be made on the most cost-effective means of

furnishing such facilities.

Proposals for material changes to ship systems and equipments arising

from a. and b. above should be made, if such changes are considered

justified on a cost-effective basis.

2.

Refit and Maintenance Requirements

In order to meet the Ship Upkeep Plan (shown in paragraph 4 below), all

21