8.

CATHODIC PROTECTION.

Is required.

9. DIVING. To carry 4 BASCCA (GP) sets with associated equipment and a

Dunlop portable air compressor for charging purposes.

10. SEWAGE DISPOSAL. A sewage disposal system is required.

11.

PAINTING. In order to minimise corrosion and to obtain the best service

from paints and compositions, all steelwork is to be prepared, treated and

painted in accordance with DG Ships to advise - noting high ambient temperatures/

humidity in operating areas].

12.

SEAMANSHI.

a.

The following facilities are required:

Towing capability forward and aft.

b. Permanent towing slip on transom.

હૈ

Collapsible inter-ship brow and stowage.

Capstan/winch/windlass on quarterdeck.

CAPIC to specify type of equipment required and, if possible, manufacturer].

Shackleometer on bridge (for darkened ship night anchoring).

f. Three danbuoys plus suitable stowages (para 6à refers).

g.

Oversize picking up rope.

20

CONFIDENTIAL/LOCSEN

JT/5