SECRET/LOCSEN

to all maintenance periods (ie craft availability), when considering the number of

vessels needed.

38.

The following assumptions have been made in assessing crew availability:

a. The full complement is required during LSP's.

b. Leave can be taken by some personnel during BMPs and longer maintenance

periods.

C.

Rest and recreation allowance - 2 days/week (ex leave periods) d. Bank/Public holidays

e.

Leave

www.

17 days/year (UK and Chinese) - up to 19 days/man/year

On the basis that it will be possible to grant half the Bank/Public holidays and

half the longer leaves during BMP, or other extended maintenance periods, the above figures equate to an additional 95 non-operational days/year for the craft/complement.

39. In conjunction with craft non-operational days (95) this gives an overall peacetime Availability of approximately 48% ie (365-95-95) x 100 = 47.94%)

365

On this basis a nominal force of 4.2 vessels ie (2 x 100) would be required to

48 ensure that 2 craft are available for peacetime patrols. Again, in practical

terms, this indicates a requirement for a Squadron strength of 5 vessels.

40. As with the previous calculation, the figures makes no allowance for breakdown

non-operational periods (Reliability), however, it is considered that a force of 5 vessels would provide sufficient margin to meet this eventuality for peacetime operations DFM to confirm and advise suitable Reliability targets for Part J. The occasional requirement for a third craft during peacetime operations (paragraph 20),

can be met with five vessels at some sacrifice to short term crew rest periods

or craft maintenance (LSPs).

41. On the basis of the above arguments, a procurement programme for 5 replacement Patrol Craft is proposed.

CRAFT MANN ING

42. DNMR to propose suitable wording based on the conclusion of the investigations under NSR Expanded Statement, Part A, para 127

SUPPORT

43. The Craft will be maintained with the same facilities as their predecessors.

In view of the advanced weapons and communication fit, some enhancement of the Weapon Engineering capability may be required/DFM to quantify.

SHOPEE 1

12

SECRET/LOCSEN