12000 k
T:
HUK HANG ROAD
TOLL
BOOTHS
SHONCRETE
425
23.40LANES
1 2500 N
FOR DETAILS, SEE DRG CM 46
ADMINISTRATION AND
VENTILATION BUILDINGS
SOUTH PORTAL
SVOM ONE N
SW
VENTILATION DUCTS
925
z
NORTHBOUND
TUBE
- - - - ----
SOUTHBOUND
TUBE
2.92
17140 LANKS
!
VENTILATION
TYPICAL CROSS SECTION
OF TUNNELLIN ROCK
TYPICAL CROSS SECTION OF TUNNEL AT PORTALS
AKS
INK
MT N CHU
SGN
ROAD
DUCTS
50
ROAD
UPPER
READ
OWER
VENTILATION
BUILDING
NORTH
PORTAL
拿钱
14500N
LIMIT OF
PROJ
TE di
7
CONTINUATION UNDER ITEM HATIF-
„CANAL ROAD FLYOVER :
EXTENSION TO
NOTES
THIS DRAWING BASED ON PROPOSAL BY MAUNSELL CONSULTANTS ASIA
WONG NAJ CHUNG ROAD.
no datın
ceciliew
inicial
REVISION
arveyed
designed
MCA
<TRUT
MCA
traced
224.76
whacked
approved
FIRE FICT
Chief Engineer
Cele
Highways / Consultants Management
לולו
the ne,
HH 14(6)
1
okrywamalj 150%;
ABERDEEN
CM 74
TUNNEL
HIGHWAYS
CONDUITANTS
OFFICE
MANAGE MEN!
Ples
1 5000
DIV
BO
+
PUBLIC WORKS
DEPARTMENT
H
AI 941 194