TO ROUTINE BTC HONG KONG TELNO CREDA 227 OF2224AUGUST 1977.
INDEX
RY
na Taken
FROM EGAN (FOR MACDONALD), IC2. LIPPITT HAS WRITTEN TO KADOOR IE OUTLINING MAIN FEATURES OF JUK PROPOSALS FOR POWER STATION PROJECT. A COPY IS BEING SENT TO
YOU BY BAG FOR ONWARD TRANSMISSION TO GORDON. IN MEANTIME YOU MAY CARE TO HAVE TEXT OF LETTER, AS FOLLOWS:
BEGINS
(190
190
PIA
C
I WAS DELIGHTED TO HAVE THE OPPORTUNITY OF DISCUSSING THE HONG
KONG PROJECT IN DETAIL WITH YOU DURING YOUR VISIT TO LONDON. IN
OUR DISCUSSION I SAID THAT THE BRITISH GOVERNMENT WAS PREPARING PROPOSALS (WHICH I INTEND TO PRESENT IN HONG KONG PROBABLY EARLY IN SEPTEMBER) WHICH, WE HOPE, WILL HAVE THE FOLLOWING MAIN FEATURES:
(1) OUR PROPOSALS WOULD COVER ALL ASPECTS OF THE DESIGN AND SUPPLY
OF THE MAJOR EQUIPMENT FOR A NEW POWER STATION ON LANTAU
ISLAND AND WOULD INCLUDE THE TRANSMISSION LINK WITH CHINA LIGHT AND POWER/PEPCO'S TRANSMISSION SYSTEM ON THE MAINLAND:
(11) THE DEPARTMENT OF INDUSTRY WOULD NOMINATE THE COMPANIES TO
SUPPLY THE MAIN ITEMS OF EQUIPMENT. THE DEPARTMENT WOULD INDICATE THE COST OF THE PROPOSALS TO CLP/PEPCO:
(111) CIVIL ENGINEERING CONSULTANTS AND A CONSULTANT ARCHITECT
WOULD PROVIDE CIVIL ENGINEERING DESIGNS AND ARCHITECTURAL
TREATMENT:
(IV) THE SERVICES AND EXPERIENCE OF THE CENTRAL ELECTRICITY
GENERATING BOARD WOULD BE AVAILABLE TO SUPERVISE THE WORK AT ALL STAGES IN FULL CO-OPERATION WITH CLP/PEPCO STAFF.
IN PARTICULAR THE CEGB WOULD:-
ADVISE ON SITE DEVELOPMENT WORK:
ASSIST CLP/PEPCO IN MONITORING THE CONTRACTORS' ACTIVITIES
IN THE UK:
REVIEW THE DESIGN OF ALL PLANT AND EQUIPMENT AND THE SYSTEM
DESIGNS FOR THE STATION:
UNDERTAKE QUALITY CONTROL SURVEILLANCE DURING MANUFACTURE, PROGRAMMING AND SCHEDULING OF THE UK ACTIVITIES:
PROVIDE ADVICE ON THE SERVICES REQUIRED WITHIN A COAL-FIRED