COMPARATIVE STATEMENT OF THE ESTIMATED AND ACTUAL EXPENDITURE

FOR THE YEAR ENDED 31ST MARCH, 1976

Heads and Subheads

72 PUBLIC WORKS

NON-RECURRENT;

ENGINEERING Contd.

Land Development Contd.

Subheads

577 Kowloon foothill development,

Special/

Original Estimate

Actual

Over the Estimate

Under the Estimate

Supplemen- *Virement tary Votes Warrant

Nos.

Hea

$

$

$

investigation

578 Junk Bay development

900,000

6,200.00 665,560.97

6,200.00

6,200 7

579 New villages in the New Territories

---investigations

10,000

234,439.03

10,000.00

580 Lantau bridge and recreational

development in Lantau, Sai Kung, Middle Island and Ma Wan- investigations

90,000

33,262.38

56,737.62

581 Landslide preventive measures for

31 areas

55,000.00

55,000.00

500,000

582 Yuen Long industrial estate

development investigations

Port Works

74,198.31

74,198.31

90,000

22

21

27

615 Central reclamation, stage V

2,280,000

931,656.27

1,348,343.73

616 Wan Chai reclamation, stage I

617 Aldrich Bay reclamation, Area A-

stage I

618 Aldrich Bay reclamation, Area D-

stage I

10,000

9,475.39

524.61

619 Aldrich Bay reclamation Area B 620 Chai Wan seawall, stage II, phase I... 621 Extension of twin box culvert, Chai

Wan reclamation-final section 622 Chai Wan seawall, stage II, phase 2... 623 Chai Wan seawall, stage II, phase 4... 624 Aberdeen reclamation, stage II-

phase I A

625 Aberdeen reclamation, stage II—

phase I B

626 Sandy Bay reclamation, stage I 627 Sandy Bay reclamation, stage II 628 Disposal of solid wastes---

investigation

3,410,000

220,000

3,045,268.29

92,751.85

364,731.71

127,248.15

72-

NOI

ENGII

Por

Subheads

645 Sai Kung

Kung 646 Extensio

passen

647 Incinerat 648 Compost

stage I

675 Mount E mecha

676 Mount F haulag

677 Diamon 678 Permane 679 Diamon

690 Kowloo

Hom- 691 Kowloo

widen Marke

692 Railway railwa

693 Railway

19,013.00

705 Minor ( selecte 706 Minor c ing ite Progr

200,000

1,200,000

639 Ma Tau Kok public pier

550,000 10,000

20,000

987.00

629 Fifth incinerator unit at Kennedy

Town

3,610,000

630 Kennedy town reclamation, stage II

631 Yau Ma Tei slipway reprovisioning,

stage I, pier and slipway

632 Tong Mi Road extension and

reclamation, stage II

633 Tong Mi Road extension and

reclamation, stage III

634 Dredging for a new fairway at Yau

Ma Tei typhoon shelter

635 Incineration and composting plant,

Kowloon

636 Second incinerator in Kowloon

637 Third incinerator in Kowloon

(consulting engineers)

638 Sham Shui Po ferry pier and

reclamation, stage I

972,000

110,000

100,000

500,000 497,573.53

2,650,485.22 371,841.49

959,514.78 600,158.51

21,008.62

157,059.72

88,991.38

57,059.72

460,200 14 & 21

2,426.47

710 Waterfr Road

711 Waterfr 712 Cross F

nectic

136,945.00

1,224,738.85

63,055.00

Kowl

Cons

24,738.85

1,300,000

21

713 Connau

773,951.49

223,951.49

600,000

33

10,000.00

640 Fire boat berth, Canton Road fire

station

641 Feasibility study of a proposed

container terminal at Kwai Chung

10,000

642 Container terminal at Kwai Chung-

clearance of borrow areas

480,000

23,753.74

643 Container terminal at Kwai Chung-

access roads

140,000

126,405.36

644 Jetty at Pak Sha Wan, Hebe Haven...

10,000

10,000.00

456,246.26

fees :

13,594.64 10,000.00

717 Pok Fu

part

714 Elevate

Road to W

road site it

715 Hong

-inv

716 Hong K

Stage and

86