CONFIDENTIAL
ANNEX A
SIZE, COMPOSITION AND COST OF GARRISON
whean extradiaz
conjunction of metaphors!
1.
Teeth Arm Elements
(a)
Navy
5 Patrol Craft
(b)
Amay
(c)
1 UK Infantry Battalion
3 Gurkha Battalions
1 Gurkha Engineer Squadron (plus training element)
Air Force
1 Helicopter Squadron (8 aircraft)
2.
Support Elements
Such support elements as are necessary to sustain the teeth arm elements.
3.
Cost
The cost of the garrison at September 1975 price levels is HK$450M.
Al
CONFIDENTIAL