ANALYSIS OF COST FIGURES

INCLUDED IN THE WORKING PARTY REPORT

1.

Cost of the preferred garrison.

plus

Frigate refit

£ M p. a.

40.0

0.

5

(this total excludes the capital cost of new

40.5

patrol craft (£2. 5M each or £0. 25M per annum)

2. Proposed reductions in the support of the

preferred garrison.

a. Capital Works

(1) Reduction in MQ build at

Stanley

(2) Reduction in MQ build at

Sek Kong

(3) Reduction in size of

ammunition sub depot at Tai Mo Shan

0.4

b. Utilisation of spare BMH capacity by the Hong Kong Govt. (purely for the purposes of this assess- ment, it is assumed that 25% of the present hospital running costs would be met by the Hong Kong Medical and Health Dept.)

c. Reassessment of the residual

requirement for hirings.

The present costing includes:

Navy 0.3

Army 0.7

1.0

The revised requirement is estimated to cost 0.8 but in addition, the elimination of private hirings will reduce LOA by an estimated 0.1. total saving under this heading is therefore

The

A-1

0.1

0.5

0.4

0.3

G.F. 316