NAVY

CM

CONFIDENT,

ANNEX A

A.

PROPOSED HONG KONG GARRISON

SUMMARY OF BUDGETARY COSTS

1976/1977/1978/1979/1980/ 77 78 79 80 81

REMARKS

1.6 Frigate. refit required in 1977/8

1.0 Fluctuations reflect phasing of contract

maintenance

FRIGATE

1.6 4.0 1.6 1.6

PATKOL CRAFT

SUPPORT COSTS

TOTAL

1.0 0.7 1.0 0.9 1.3 1.3 3.9 6.0 4.0

1.4

1.5

1.5

4.0

401

ARMY

TEETH ARM UNITS

9.9 8.0 8.0

8.0

8.0

SUPPORT UNITS EQUIPMENT

OTHER SUPPORT COSTS TOTAL

13.813.0 |13.3 13.3

3.6 3.6 3.6 3.6 3.6 2.2 2.1 2.1 2.1 2.1 29.5 26.7 27.0 27.0 26.7

13.0

AIR FORCE

HELICOPTER SQUADRON

SUPPORT COSTS

· TOTAL

0.7 0.7 0.7 0.7 0.7 0.9 0.9 0.9 1.6

1.6 1.6

0.9 0.9

1.6

1.6

WORKS SERVICES

6.0 6.0

6.0

6.0

6.0 Capital works programme arbitrarily reduce

to £4il per year.

AIR TROOPING

2.4. 2.4

2.5

2.5 *2.2

GRAND TOTAL

43.4 42.7 41.1

41.1 40.6

NEW PATROL CRAFT

0.1 2.3 5.8 Capital cost based on present plans

LOCAL DRAWINGS" OF

B.

SUMMARY OF FOREIGN EXCHANGE COSTS

}

13.4 11.9 12.1 12.0 12.0 UK and GURKHA personnel only

PAY

}

PAY OF LOCALLY

5.1

4.9

4.8

4.8 4.8 Service and Civilian

ENGAGED EMPLOYEES

KARRIED QUARTERS

1.2

1.2

1.3 1.3

1.3

AND HIRINGS.

WORKS SERVICES

3:09

OTHER PAYMENTS AND RECFIFTS (NET)

TOTAL FOREIGN EXCHANGE COSTS

6.0 6.0 6.0 6.0 6.0

3.0

2.6 2.9 2.7 2.8

28.7 26.6 27.1 | 26.8 | 26.9

1

Share This Page